What Actually Happens on Roof Install Day
Most complaints about roofers aren’t about the roof. They’re about nobody telling the homeowner what was going to happen.
Crews arriving unannounced. Gates opened without asking. A date that moved with no phone call. A change order appearing on the invoice that was never discussed. Every one of those is avoidable with a conversation.
Here’s exactly what our install day looks like.
Key takeaways
Most Boise roofs finish in a single day; larger or steeper ones take two
Crews typically start around 7:00
Nobody enters your backyard without asking first
If we find bad decking, you get a call and a price before we continue
Magnetic nail sweep at the end of every day, and again the next day
Tell us about pets, night-shift sleepers or a home office and we’ll work around it
The day before
We call or text to confirm. Time, crew size, what’s happening.
If the date moves, you hear it from us. Weather, or a previous job running long. You should never find out your roof isn’t happening today by looking out the window at an empty driveway.
What you should do:
Move vehicles clear of the driveway and anywhere below the roofline
Take down anything on walls that vibration might shift — pictures, mirrors, shelves
Cover anything in the attic you care about; tear-off shakes dust loose
Tell us about pets, a home office, a night-shift sleeper, or anything else timing-sensitive
Morning — arrival and setup
Crew arrives around 7:00. Early starts matter in Boise summers — working a roof at 2pm in 95°F is slower and less safe than working it at 7am.
We knock before we start. You’ll know we’re here before you hear anything on the roof.
We ask before opening any gate. Nobody walks into your backyard unannounced. If we need rear access we’ll ask and you can decide.
Then setup, before a single shingle moves:
Tarps around the perimeter to catch tear-off debris
Flower beds and shrubs covered
Plywood over anything fragile — AC units, skylights below, patio furniture
Vehicles confirmed clear of the drop zone
Dumpster or trailer positioned — in the North End that usually means the alley
Tear-off
The loud part. Two to four hours on a typical Boise home, depending on size and how many layers come off.
It is genuinely noisy, and it vibrates through the house. If you’re working from home, a call-heavy morning is worth rescheduling.
Everything comes off down to the decking. This is also the only moment anyone will see your roof deck for the next twenty years — which is why what happens next matters.
The decking inspection — where surprises live
With the roof open, we inspect the deck: soft spots, rot, delamination, previous repairs, gaps.
If we find damage, you get a call and a price before we continue. Not a note on the invoice afterward.
Decking runs $45–$75 per sheet in Boise. On most homes it’s a few sheets or none. On older Bench and North End houses — especially where there’s been ice damming at the eaves — it can be more.
No change order lands on your invoice that you didn’t approve first. That’s the whole point of being on site with the roof open.
Installation
Underlayment, then ice and water shield at the eaves — Boise requires it extending 24 inches upslope past the exterior heated wall line, and 36 inches on pitches of 8/12 and steeper.
Then drip edge, valleys, flashing, field shingles, penetrations, ridge.
Ventilation happens here too. If we’re converting box vents to a ridge vent, this is the moment. It’s the single most-skipped improvement on a Boise roof and it’s far cheaper done now than retrofitted later.
Cleanup
Magnetic sweep at the end of every day — lawn, driveway, beds, sidewalk. Then again at the end of the job.
Tell us if you have dogs or kids who go barefoot and we’ll go over it twice. This is the single most-mentioned thing in roofing reviews, and it’s mentioned because it’s the thing homeowners actually worry about.
Debris is blown off patios, walkways and any hard surface. Gutters are cleared of tear-off debris.
Final walkthrough
We walk it with you before we leave. Ground level — you shouldn’t be on a new roof.
We’ll show you what was done, anything we found and fixed, and where the warranty documentation is. If something isn’t right, this is the moment to say so, while the crew and the materials are still here.
Timeline summary
|
Average Boise home, single layer
|
1 day |
|
Two layers coming off
|
1–2 days |
|
Large or steep roofline
|
2 days |
|
Complex, multi-faceted
|
2–3 days |
|
Add gutters
|
Half a day |
What extends it: weather, unexpected decking, and material delivery. We’ll tell you the moment any of the three happens.
FAQs
Do I need to be home?
No, but it helps to be reachable — the decking call is the one you don’t want to miss.
Can I stay in the house during the work?
Yes. It’s loud, and dust comes down in the attic. Some people prefer to be out for the tear-off hours.
What about my pets?
Tell us. Dogs especially — the noise is stressful and there’s a lot of gate movement. Many owners arrange a day out.
What if it rains mid-job?
We don’t tear off more than we can close in a day. If weather comes in, the roof gets dried in before the crew leaves.
Will you damage my landscaping?
We tarp and cover before anything comes off. Tell us about anything particular you’re protective of and we’ll plan around it.
What if I find a nail afterwards?
Call us. We’ll come back and sweep again. It shouldn’t happen, and if it does we want to know.